CLUDEN TO BRIGHOUSE BAY GASLINE
Project Description:
A new 50km gas pipeline between Cluden and Brighouse Bay in Scotland was completed in December 2020. The commissioning of this pipeline completed the full twinning of the two gas interconnectors between Ireland and the UK. The project comprised of a 50km of 900mm diameter high-pressure gas pipeline construction. LCE undertook the role of contractors civil designer for all drainage elements on this project. LCE also carried out design checks and review for portions of the main gas pipeline.
Scope Description:
Pre-Construction, Post-Construction, Storm Drainage Design
Hydraulic modelling including SuDS features
Culvert design
Stormwater management designs including settlement pond and check dams
Permanent and temporary high-pressure gas pipeline support design
Gas pipeline stress analysis review
PROJECT DATA
Client:
Roadbridge UK Ltd for GNI UK Ltd
Project Location:
Cluden, Galloway, Scotland, UK
Project Duration:
2016-2020