TARA GLEN OUTFALL
Project Description:
EPS is appointed by Tara Glen Golf & Country Club to upgrade and existing waste water treatment plant for a holiday village and golf club along the Wexford coastline. The project included a 120m long 225mm HDPE outfall pipeline located in a highly variable sandy beach on an exposed coastline. LCE is appointed from concept through to detailed design and construction.
Scope Description:
Hydrographic survey and data collection scoping, procurement and management
Design of HDPE subsea pipeline
Pipeline ballast and stability design to DNV and PDS010 using a bespoke chain and clamping system
Seabed evolution assessment
Hydrodynamic load assessment (Wave & Current)
Pipeline diffuser end stability using Geotextile Sand-filled Containers.
PROJECT DATA
Client:
EPS
Project Location:
Tara Glen, Ballymoney, Co. Wexford
Project Duration:
2021-2022