TARA GLEN OUTFALL

TARA GLEN OUTFALL

Project Description:

EPS is appointed by Tara Glen Golf & Country Club to upgrade and existing waste water treatment plant for a holiday village and golf club along the Wexford coastline. The project included a 120m long 225mm HDPE outfall pipeline located in a highly variable sandy beach on an exposed coastline. LCE is appointed from concept through to detailed design and construction.

Scope Description:

  • Hydrographic survey and data collection scoping, procurement and management

  • Design of HDPE subsea pipeline

  • Pipeline ballast and stability design to DNV and PDS010 using a bespoke chain and clamping system

  • Seabed evolution assessment

  • Hydrodynamic load assessment (Wave & Current)

  • Pipeline diffuser end stability using Geotextile Sand-filled Containers.

PROJECT DATA

Client:

EPS

Project Location:

Tara Glen, Ballymoney, Co. Wexford

Tara Glen, Ballymoney, Co. Wexford

Project Duration:

2021-2022