GREENOCK OCEAN TERMINAL UPGRADE
Project Description:
Roadbridge UK Ltd was appointed for the construction of a new dedicated cruise ship berthing facility to the east of an existing cargo berth. The new berthing facility is constructed as a 2.2m diameter monopile structure with pontoon access. LCE carried out a CAT3 review of the pile design including consultations with the designer and contractor.
Scope Description:
Monopile analysis
Berthing fender design review
CAT3 review
Liaise with designer and contractor
Review of designer’s basis of design and recommendations on optimisations
PROJECT DATA
Client:
Roadbridge UK Ltd. for Peel Ports Group UK
Project Location:
Glasgow, Scotland
Project Duration:
2019