WESTPORT SOUTH MALL DRAINAGE
Project Description:
LCE was appointed by Mayo County Council to develop a flood alleviation solution for the South Mall in Westport, Co. Mayo. A historic drainage issue resulted in pluvial flooding along the southern side of the Carrowbeg River in Westport town, resulting in flooding of access and properties. LCE was appointed to assess the existing as-built drainage and design the remediation.
Scope Description:
Civil engineering design
Site investigation scoping, procurement and management including CCTV surveying
Options assessment and identification of preferred scheme
Detailed hydraulic modelling
Drainage modelling and design (incl. SuDS)
Procurement under the Capital Works Management Framework (CWMF)
PSDP
PROJECT DATA
Client:
Mayo County Council
Project Location:
Westport, Co. Mayo
Project Duration:
2020