WIND FARM DRAINAGE REMEDIATION
Project Description:
Teevurcher windfarm was constructed in 2018 by Natural Power, with a capacity of 9MW. Some minor drainage issues arose in the operational phase under the ownership of NTR Plc.
NTR appointed LCE to investigate the drainage issue and develop the design of a remediation solution.
Scope Description:
Catchment analysis
Drainage modelling
Analysis of existing as-built drainage and critical downstream culverts
Design of drainage remediation
PROJECT DATA
Client:
NTR PLC
Project Location:
Teevurcher, Co.Meath
Project Duration:
2020