WIND FARM DRAINAGE REMEDIATION

WIND FARM DRAINAGE REMEDIATION

Project Description:

Teevurcher windfarm was constructed in 2018 by Natural Power, with a capacity of 9MW. Some minor drainage issues arose in the operational phase under the ownership of NTR Plc.
NTR appointed LCE to investigate the drainage issue and develop the design of a remediation solution.

Scope Description:

  • Catchment analysis

  • Drainage modelling

  • Analysis of existing as-built drainage and critical downstream culverts

  • Design of drainage remediation

 

PROJECT DATA

Client:

NTR PLC

Project Location:

Teevurcher, Co.Meath

Teevurcher, Co.Meath

Project Duration:

2020