OWENINNY CRANE SUPPORTS
Project Description:
BMS Heavy Cranes is appointed by Nordex on behalf of ESB to lift turbines blades and towers into place on the Oweninny wind farm project. The max hoist height of the crane is 193m. The windfarm when complete, will have an installed generating capacity of 172MW.
LCE was appointed by BMS Heavy Cranes to assess crane hard standing and design the temporary crane supports for various crane lift and temporary set-down operations.
Scope Description:
Geotechnical analysis
Temporary works design of crane supports
Temporary works design for timber and steel supports
PROJECT DATA
Client:
BMS Heavy Cranes Ltd
Project Location:
Oweninny, Co. Mayo
Project Duration:
2022