Project Description:
Roadbridge UK Ltd was appointed for the enabling works as part of a 37km onshore cable corridor from Bawdsey Landfall to Bramford Substation. The wayleave enabled the connection of a 714 MW offshore windfarm to the UK grid onshore at the East Anglia One substation. LCE was appointed for the alignment design of a 37km haul road to facilitate the cable transport vehicles.
Scope Description:
Haul road design
Road alignment design using Bentley MX Road Suite
Vehicle Swept Path Analysis for bespoke cable transport vehicles
Pavement design
Geotechnical design
PROJECT DATA
Client:
Roadbridge UK Ltd for Scottish Power Renewables
Project Location:
Bamford, Suffolk, UK
Project Duration:
2017-2019