Project Description:

Roadbridge UK Ltd was appointed for the enabling works as part of a 37km onshore cable corridor from Bawdsey Landfall to Bramford Substation. The wayleave enabled the connection of a 714 MW offshore windfarm to the UK grid onshore at the East Anglia One substation. LCE was appointed for the alignment design of a 37km haul road to facilitate the cable transport vehicles.

Scope Description:

  • Haul road design

  • Road alignment design using Bentley MX Road Suite

  • Vehicle Swept Path Analysis for bespoke cable transport vehicles

  • Pavement design

  • Geotechnical design



PROJECT DATA

Client:

Roadbridge UK Ltd for Scottish Power Renewables

Project Location:

Bamford, Suffolk, UK

Bamford, Suffolk, UK

Project Duration:

2017-2019