Roadbridge UK Ltd was appointed to upgrade an existing 25km windfarm access road from the A713 to Blackhill Substation. Works included, formation stabilization, revised geometry to enable future windfarm construction access, 188 culvert upgrades and environmental mitigation measures. LCE undertook the lead civil designer for all road alignment and drainage upgrades.
Scope Description:
Road alignment design services
Pavement design
Auto-tracking services for blade delivery vehicles
Earthworks volume analysis
Value Engineering exercises
Drainage modelling and assessment of existing culverts and open channels
Design of culvert upgrades and development of a drainage risk register
PROJECT DATA
Client:
Roadbridge UK Ltd for Scottish Power Renewables
Project Location:
Dunhill, Galloways, Scotland, UK
Project Duration: