top of page

EDMONTON GREEN-ROOF UPGRADES
Project Description:
Edmonton Green Shopping Centre is a 120 unit shopping center in the heart of London. In 2016 the roof cladding system began to fail, with section of cladding becoming disconnected from the main structural frame. LCE was appointed by a UK roofing contractor to investigate the structural issues. LCE designed a bespoke cladding clamping system to retrofit the roof cladding to the structural frame throughout the building.
Scope Description:
Investigation, survey and structural condition inspections
Design of steel structures and fixings
Ancillary Certifier role
PROJECT DATA
Client:
Rossway Dowd Ltd
Project Location:
London N9 0TZ

Project Duration:
2016
bottom of page